W1. nsat EOS uniform prior

A1. Parameter Estimates

Parameter 90% Credible Interval Maximum Posterior Maximum Likelihood
$m_1^{\rm{src}}$ $1.783^{+0.111}_{-0.056}$ -- $1.874$
$m_1^{\rm{src}}$ $1.521^{+0.042}_{-0.060}$ -- $1.485$
$\mathcal{M}^{\rm src}$ $1.437^{+0.013}_{-0.014}$ -- $1.451$
$M_{\rm total}^{\rm src}$ $3.312^{+0.047}_{-0.033}$ -- $3.360$
$q$ $1.173^{+0.120}_{-0.066}$ -- $1.262$
$k_{\rm{EOS}}$ $1100^{+640}_{-140}$ -- $1510$
$\chi_\mathrm{eff}$ $0.0033^{+0.0083}_{-0.0027}$ -- $0.0102$
$\Delta t_c$ $-0.0156^{+0.0316}_{-0.0021}$ -- $0.0148$
$d_L$ (Mpc) $158^{+38}_{-41}$ -- $112$
$z$ $0.0348^{+0.0080}_{-0.0088}$ -- $0.0249$

Number of posterior samples: 49048



Link to File

A2. Posteriors

Link to File

A3. Posteriors

Link to File

A4. Posteriors

Link to File

A5. Posteriors

Link to File

A6. Posteriors

Link to File

W2. 2nsat EOS uniform prior

A1. Parameter Estimates

Parameter 90% Credible Interval Maximum Posterior Maximum Likelihood
$m_1^{\rm{src}}$ $1.696^{+0.065}_{-0.055}$ -- $1.766$
$m_1^{\rm{src}}$ $1.558^{+0.058}_{-0.067}$ -- $1.483$
$\mathcal{M}^{\rm src}$ $1.416^{+0.016}_{-0.020}$ -- $1.408$
$M_{\rm total}^{\rm src}$ $3.257^{+0.035}_{-0.047}$ -- $3.250$
$q$ $1.088^{+0.091}_{-0.069}$ -- $1.191$
$k_{\rm{EOS}}$ $1640^{+210}_{-190}$ -- $1550$
$\chi_\mathrm{eff}$ $-0.0044^{+0.0092}_{-0.0065}$ -- $0.0043$
$\Delta t_c$ $-0.02024^{+0.04161}_{-0.00047}$ -- $0.02142$
$d_L$ (Mpc) $229^{+49}_{-21}$ -- $257$
$z$ $0.0500^{+0.0103}_{-0.0044}$ -- $0.0558$

Number of posterior samples: 52589



Link to File

A2. Posteriors

Link to File

A3. Posteriors

Link to File

A4. Posteriors

Link to File

A5. Posteriors

Link to File

A6. Posteriors

Link to File

W3. nsat EOS gw170817 prior

W4. 2nsat EOS gw170817 prior

W5. nsat EOS gw170817em prior

W6. 2nsat EOS gw170817em prior


Additional Files

The following files were also found in this directory: